Noida: Residents of Great Value Sharanam Flag Structural Safety, Poor Infrastructure

Residents of Great Value Sharanam in Noida Sector 107 raise concerns over structural safety, poor infrastructure and seepage. Structural audit found 30 columns at high risk.
Noida: Residents of Great Value Sharanam Flag Structural Safety, Poor Infrastructure

Noida, May 12: Residents of Great Value Sharanam in Noida Sector 107 are concerned about the deteriorating condition of their housing complex. Issues include poor waste management, inadequate safety systems, and widespread seepage.

Key Issues Raised by Residents

Around 6,000 people live in the housing society, and problems have persisted since buyers first started occupying flats in 2017-18. Highlighting issues like widespread seepage in flats and common areas, Bishwarup Mallick, general secretary of the AOA, said despite numerous appeals to the builder over the years, many issues remain unresolved. Firefighting systems and elevators are reportedly inadequate.

Health and Safety Concerns

Concern has intensified over health risks associated with underground water tanks situated near waste treatment facilities, raising alarm about potential contamination. Incidents of falling plaster and large cracks developing in various building structures have created a precarious living environment. The AOA has demanded a comprehensive structural audit of all towers.

Structural Audit Findings

Following sustained pressure and protests, the builder conducted a structural audit, which found around 30 columns in the society at "high risk" and an additional 129 at "moderate risk". The results indicated that further investigation could reveal even greater issues. Residents had held protests in January and last year, prompting the Noida Authority to mediate between the builder and the AOA.

Repair Work and Resident Dissatisfaction

To address these concerns, the builder has commenced plaster repair work. However, residents criticized the slow pace of repairs and the lack of a clear timeline for completion. A response from the builder's representatives is awaited on the matter.