NOC Must for Works Within 20 Meter Radius of Pune Metro Tunnel

Maha Metro has issued a mandatory directive, requiring builders and property owners to obtain a No Objection Certificate prior to starting any construction work within 20 meters of a Metro viaduct or tunnel.
NOC Must for Works Within 20 Meter Radius of Pune Metro Tunnel

Pune, April 18: This safety regulation ensures that nearby development does not compromise the structural integrity of the transit system.

Why the Directive?

The administration issued a fresh appeal following a recent incident of excavation near the Metro tunnel in the Mandai area causing damages to the tunnel structure. A police case was filed by the Metro administration.

Works Requiring NOC

  • Construction

  • Demolition

  • Redevelopment

  • All types of digging (including borewell drilling)

  • Excavation

  • Plinth work

  • Any activity requiring digging

Who Must Comply?

  • Builders and property owners

  • Government agencies involved in digging, laying of cables and utilities, excavations, and laying of any infrastructure near Metro tunnels or viaducts

Consequences of Non-Compliance

  • Legal action

  • Financial liability

Application Process

Applications for obtaining the NOC shall be submitted to the planning department through the authority concerned. More details are available on the Pune Metro rail website.

Current Metro Network

  • Operational lines: 2

  • Total length: ~33 km

  • Vanaz to Ramwadi line: Completely elevated

  • PCMC to Swargate route: Mixed-line (some portion underground)